Valleywood Construction Update for October 13, 2007
Week 20
Prayers & Comments:
Thank You, Ned and Caroline
for filling for me! It sounds like everything when very
well.
Dedication is Sunday, October
21, at 2:00pm.
Updates:
1. The crack in the foundation
has been repaired.
2. The Furnace and ductwork is installed.
3. The carpeting has been installed. The contractor
did not order enough for the closet and will return
Tuesday to finish the closet.
Progress:
Thursday
o Buried the conductor line
which was uprooted during the final grade. (Mitch, Greg,
& Ron)
o Poured concrete in the remaining
section of the sidewalk. (Mitch, Ron, Greg, John, &
Ned)
o Installed additional stepping
stones. (Phil & Ron)
o Cutoff bolt on shed door (Greg)
o Cleaned up the Mini Mobil.
(Sandy)
o Cleaned out the basement (Sandy
& Bill)
Saturday (as reported by Caroline)
o installed carpet shield
o finished screen doors (Dave
& Doug)
o caulked counter tops (Ned)
o painted safety railings (Caroline)
o install basement handrail
(Ned & Doug)
o Polyurethane handrail (Doug)
o Install door stops (Dave)
o Install towel bar in Master
bath (Doug)
o Install mini blinds (Doug
& Dave)
o Installed vent cover in large
bathroom (Mel)
o clean kitchen (Barbara)
o clean windows (Jane &
Linda)
o clean bathrooms (Caroline)
o clean porches (Jane &
Barbara)
o clean basement (Doug &
Dave)
o caulk exterior aluminum
o emptied the house- most of
it
Not Completed:
· Install backordered
splashes - not available- Monday?
· Ned said we will get
a door stop for the large bathroom that screw into the
floor, because right now the door hits the towel bar.
(I don't know if Mel is getting this piece or not.)
· Install TP holder-
it HAS been found & is in the Master bath
· Didn't have any gravel
(window wells, dry well, pad for A/C)
· Install Vent Cover-
Master bath had no cover
· Register covers- Mel
said not to "install" them because they're
pressure testing the house, so we unwrapped & set
the covers out next to their spaces
· Clean light fixtures-
we weren't sure which ones needed to be cleaned
· Basement steps have
been painted but will need a 2nd coat
Plans for the Week:
· The Electrician will
be back this week to fix issues.
· The carpet contractor
will be back on Tuesday to finish the closet.
· The Energy Star testing
will be conducted this week.
No Thursday work crew this week.
No Saturday work crew this week.
Ned, Cindy & John will work
on the unfinished items & paint touch up.
Issues:
1) No carpeting for the living
room closet
2) No gravel for the window
wells and drywell
3) Door bell does not work.
4) Electrical outlet loose.
Materials Needed:
· Missing Kitchen counter
side splash
· Missing bath vanity
side splash
· Gravel for window wells
and dry well
· 2 light bulbs for the
Master Bath
· Vent cover for Master
Bath
Volunteers Needed
We are done for this year.
Great Job!
Lunch:
We are done for this year. Great
Job!
Volunteers Report
Thursday 8 Volunteers 22 ½
Total Hours
Ned Timmons 2 hours First Community
Church
Sandy Loar 2 ½ hours
Riverside UMC
Wilson Mitchell 3 hours Riverside
UMC
Phil Reger 1 ¾ hours
Riverside UMC
Bill Van Fossen 1 ¾ hours
Riverside UMC
Greg Telles 3 ¼ hours
St Agatha
Jeffrey Clausen 3 hours St Andrew
John Fisher 5 ¼ hours
Trinity UMC
Saturday 7 Volunteers 40 ¼
Total Hours
Doug Teske 5 ¾ hours
Covenant Presbyterian
Jane Belt 6 ½ hours First
Community Church
Linda Forsythe 4 ¼ hours
First Community Church
Ned Timmons 7 hours First Community
Church
Caroline Crowley 7 ¼
hours St Agatha
Barbara McSheffery 3 hours St
Agatha
Dave Coleman 6 ½ hours
Independent
Total to date
109 volunteers
480 volunteer days
2466 volunteer hours
Thanks for all the great work
John Fisher